TOP SECRET // ERS-85 // EYES ONLY
FILE ERS85-0496 · 31 OCTOBER 1996
- SOURCE:
- Automated Security System, ERS-85 (no human author)
- PERSONNEL ON SITE:
- 137
- PERSONNEL ACCOUNTED FOR:
- 0
21:47Power fluctuation, Sublevel 4. Backup generator engaged.
21:49Door 4-C reports OPEN. Door 4-C has no record of an open command.
21:52Motion detected, ventilation shaft V-12. Shaft V-12 is 30 cm wide.
21:58Biohazard alarm, Sublevels 3 and 4. Lockdown protocol available.
22:03Lockdown protocol AUTHORIZED. Authorizing badge: HARROW, E.
22:03Elevators disabled. Stairwells sealed. Surface hatch sealed.
22:31Intercom activity, all channels. Voice match: HARROW, E. (confidence 61%).
23:16Badge HARROW, E. used at Sublevel 5. Two-key authorization:
23:17Sublevel 5 OPEN.
02:40No motion detected, all monitored areas.
02:41Motion detected, all unmonitored areas.
Recovery teams were not sent. By order of Directorate, the surface hatch was buried under four meters of concrete on 4 November 1996. All records of ERS-85 were withdrawn. Families of the 137 were told of a training accident.
The automated security system was left running to monitor the seal. It is not connected to anything above ground. It continued to file reports anyway.
Sealed
